1 ZONING BOARD OF APPEALS TOWN OF BERLIN
2 ———————————————————
3
4 In the matter of the Application of:
5 CELLCO PARTNERSHIP d/b/a VERIZON WIRELESS
6 1 Satterlee Hollow Road
7 Town of Berlin, Rensselaer County, New York
8 ———————————————————
9
10 STENOGRAPHIC MINUTES OF MEETING conducted on the
11 16th day of April, 2009, at the Berlin Town Hall, Berlin,
12 New York commencing at 7:30 p.m.
13
14
15
16
17
18
19
20
21
22
23
24
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
2
1
2 ZONING BOARD OF APPEALS:
3 DONALD FRENCH, Chairman
4 MARYELLEN GILROY, Board Member
5 VICTOR LEWIN, Board Member
6 J. NICHOLAS ADAMS, Board Member
7 DAVID THERAULT, Board Member
8 PETER HENNER, Attorney
9
10
11
12 APPLICANT REPRESENTATION:
13 J. MICHAEL NAUGHTON, ESQ., Young Sommer, LLC
14 DAVID C. BRENNAN, ESQ., Young Sommer, LLC
15 SARAH MAYBERRY STEVENS, Real Estate Manager
16 JOSEPH SORRENTINO, Radio Frequency Engineer
17 CHRISTINE HOWELL, Site Aquisition Specialist
18
19
20
21
22 REPORTED BY: SADIE L. HERBERT
Court Reporter and Notary Public
23
24
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
3
1 P R O C E E D I N G S
2 CHAIRMAN FRENCH: We’re in session now, and
3 I’ll turn it over. Peter is going to guide us
4 through the various information, and if at any
5 point you have a question, you will ask him, et
6 cetera.
7 MR. BRENNER: Okay. At the last board
8 meeting, we had — the board had adopted a
9 resolution stating that this week or this monthly
10 meeting, the monthly meeting in April, we were
11 going to go through the environmental review of
12 the Satterlee Hollow cell tower application, and
13 that’s what we’re going to do tonight. The
14 environmental review is required by the New York
15 State Environmental Quality Review Act, which
16 requires that any agency — and the Zoning Board
17 of Appeals is considered an agency within the
18 meaning of the State Environmental Quality Review
19 Act or SEQRA, I’ll use the acronym SEQRA for the
20 rest of the evening — must consider the
21 environmental impacts of its action before taking
22 any action. It doesn’t mean, the law does not
23 require that you not take an action that has
24 environmental impacts. It simply requires that
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
4
1 you consider all possible environmental impacts,
2 identify any adverse environmental impacts and
3 make a specific finding that any adverse
4 environmental impacts that you identify have been
5 minimized to the maximum extent practical. It’s
6 a basic requirement of SEQRA. In order to do
7 that, the case law has said that you must take a
8 hard look, you must consider every environmental
9 impact that you can think of, look at it and make
10 a determination that it has been minimized, as
11 much as you can minimize it. And essentially,
12 the idea is if you discover environment- — that
13 you must know what the environmental impacts are,
14 and if you find them to be sufficient, then you
15 wouldn’t go forward with the project. But if you
16 think that the project, any project, is of
17 sufficient importance, then you can go forward
18 with it, even if you have identified
19 environmental impacts, as long as they are
20 minimized as much you can practically minimize
21 them.
22 In order to do this review, it’s the law and
23 regulations, basically, to do it in several
24 stages. The stage that we’re going to do tonight
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
5
1 is to make a determination of significance. What
2 that means is we’re going to make a determination
3 whether, after a preliminary review, through a
4 review of a document called an environmental
5 assessment form, whether or not there are
6 environmental impacts that need to be minimized
7 further. If there are, we’ll make a positive
8 declaration and require the preparation of a full
9 environmental impact statement. If there are
10 not, we’ll make a negative declaration, meaning
11 that we have looked at it, the environmental
12 impacts have been minimized to the maximum extent
13 that we can, there’s nothing further we can do in
14 terms of minimizing the environmental impacts,
15 and that, in fact, we can proceed with making a
16 determination as to whether or not to approve the
17 project. We cannot make a determination to
18 approve the project until we complete this basic
19 review under SEQRA.
20 So what we do in order to make that
21 determination, positive or negative declaration,
22 is we go through this document, which is set
23 forth in the regulations, the SEQRA regulations
24 as an environmental assessment form. We don’t
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
6
1 have to use this form, but we have to use a form
2 or do a process that’s at least as protective of
3 the environment as the form requires. And there
4 is a form that’s set forth in the regulation, a
5 21 page form. The way the form works is the
6 first page is just our ultimate conclusion, the
7 determination of significance. Pages 2 through
8 10 are filled out by the applicant, and Verizon,
9 the applicant, has submitted a 10 page form where
10 they have described their project, said what it
11 is, answered questions about what kinds of things
12 they’re going to be doing, how much area will be
13 disturbed, their assessments of various questions
14 about what the project is, and they’ve submitted
15 that and along with a — they’ve also submitted
16 other documents, they’ve submitted a visual
17 impact analysis, and they’ve basically described
18 what their version of the project is. By law,
19 that’s their responsibility to submit. If we
20 look at this, and say, hey, there are impacts or
21 things that you haven’t considered, we can
22 certainly — we’re not bound by it, but
23 nevertheless, by law, they submit that, and
24 that’s what they do, and that’s part of the
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
7
1 assessment.
2 The part that we’re going to spend the most
3 of the time tonight on is the so-called Part 2,
4 which is Pages 11 through 20 of the form. This
5 form basically lists a series of potential
6 environmental impacts and requires us to ask
7 these questions, are these issues that are
8 identified, and you’ll hear them as we go through
9 them, I’ll read them into the record as we
10 consider each one, whether or not there are
11 actual impacts, and the board will make a
12 determination if there is an impact, if it is a
13 large impact, or if it’s just a small or moderate
14 impact, and what the impact is. If the board
15 finds after the review of this process that there
16 are, in fact, impacts, then it will consider
17 Part 3 of the application, whether or not those
18 impacts can be mitigated, and whether or not
19 further mitigation is necessary, and may make a
20 determination that we need more study of it, in
21 which case, we would lean towards — we would
22 probably have to go to a positive declaration to
23 further analyze those impacts.
24 Now, the question may be asked, and I think
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
8
1 the way I’m going to do this is to consider the
2 first part of the question is, okay, what is the
3 action under consideration. The action under
4 consideration, simply stated, is the application
5 for a cell tower at the Satterlee Hollow site.
6 However, the question is, is this part of a
7 larger action, or is this an action that stands
8 on its own? And a related, but different
9 question — and I’ll describe the differences —
10 is a question of whether or not the impacts of
11 this project should be considered cumulatively to
12 the impacts of other projects. Now, under the
13 town telecommunications law — I’ll refer to it
14 throughout the evening as just the
15 telecommunications law or the law or possibly,
16 even, the ordinance — the law requires that an
17 applicant for a cell tower must identify other
18 intended sites for cell towers that it’s
19 proposing to adopt. And in compliance with this,
20 Verizon actually went well beyond the
21 requirements of the law. The law simply requires
22 that they identity what sites they might be
23 considering. What Verizon did was, they
24 submitted, essentially, a full application for
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
9
1 another site besides Satterlee Hollow, the Cherry
2 Plain site, and they provided additional
3 information, far more than was required to be
4 provided, in terms of what they might want to do
5 at Cherry Plain. Now, that raises the question
6 of, is the Cherry Plain application — is this
7 part of one common plan. And if so, the board
8 has an obligation, if the board makes a
9 determination that it is part of a common plan,
10 the board has to consider whether it should
11 consider the two applications as one plan or
12 whether they are separate plans.
13 There’s a lot of case law and regulations
14 talking about a concept called segmentation.
15 What segmentation is — usually, in a lot of the
16 commentary, segmentation is usually linked to the
17 word impermissible segmentation. The idea is, if
18 you have a project that is to be considered, you
19 cannot segment the environmental review. I’ll
20 give you one simple example. You have somebody
21 who wants to put a large subdivision of a hundred
22 units. Well, if you do a hundred units, you have
23 a lot of environmental impacts. And so to avoid
24 doing that that they say, we’re only going to put
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
10
1 in ten units at a time. It’s no big deal to put
2 in ten houses, ten houses, ten houses, and the
3 total idea is you put in a hundred houses, and it
4 was all part of one intended subdivision, and low
5 and behold, you have a whole bunch of
6 environmental impacts, and you’ve avoided the
7 review of it by segmenting the review. That’s
8 just for illustrative purposes. The question
9 that’s going to be before the board is, with
10 these two applications, the Cherry Plain and
11 Satterlee Hollow site, is it impermissible
12 segmentation to consider them separately, or does
13 each application stand on its own? In order to
14 make that determination the board is going to
15 have to — the test for segmentation that is
16 usually used is an eight part test set forth in a
17 document published by DEC called “The SEQRA
18 Handbook”, and determine whether or not the two
19 applications are part of the same — of a common
20 plan. And I would caution that the fact that
21 these two applications are both submitted by the
22 same applicant does not mean they’re part of the
23 same plan, nor does the fact that they are two
24 separate applications for cell towers. The mere
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
11
1 fact that two separate projects of the same type
2 of project are submitted, and they may, in fact,
3 have some relationship does not mean they’re part
4 of the same plan, and I will go over, and the
5 board will review the criteria to make that
6 determination.
7 A related concept to that is the concept of
8 cumulative impacts, whether or not the impacts of
9 one project should be considered together with
10 the other. And one of the questions is, if you
11 are going to build Satterlee Hollow, will that
12 have any impacts that will affect Cherry Plain or
13 vice versa? So we can’t just say — and when we
14 go through the ten pages of impact criteria,
15 we’ll address the question of, what are the
16 impacts of Satterlee Hollow. Well, as part of
17 the consideration of the impacts of Satterlee
18 Hollow, if we know that Cherry Plain is out
19 there, then the question is, knowing that Cherry
20 Plain is out there, are there other impacts of
21 Cherry Plain that we should consider as part of
22 Satterlee Hollow. And vice versa, will Cherry
23 Plain’s impacts have any impact on Satterlee
24 Hollow, either way. Now, this is a little bit —
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
12
1 the board has not reviewed the Cherry Plain
2 application. We have not had a public hearing on
3 it, we have not received comments on it, we have
4 not — a balloon test has been done, but the
5 board has not fully reviewed Cherry Plain. So
6 the question may be, assuming that there are
7 impacts at Cherry Plain, which I’m not assuming
8 there are or aren’t, and I don’t think the board
9 can make that assumption at this point, but
10 nevertheless, if there are, the question is, does
11 that effect Satterlee Hollow? Because it may be
12 and the board may decide that regardless of what
13 happens at Cherry Plain, it doesn’t affect
14 Satterlee Hollow, because Satterlee Hollow is
15 several miles away, it is a project that can go
16 forward without Cherry Plain. In fact, we don’t
17 know that Cherry Plain will ever go forward. We
18 only know that an application has been submitted.
19 So if the Cherry Plain application is withdrawn,
20 we may still approve Satterlee Hollow. And for
21 that matter, if we say they’re all part of one
22 plan and the applicant doesn’t proceed with
23 Cherry Plain, then where are we with Satterlee
24 Hollow, that’s another question the board may
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
13
1 have to consider.
2 This is just to explain the process for the
3 record and to explain what we’re going to be
4 doing. But I have also drafted, for the board’s
5 consideration, a document describing the
6 segmentation and cumulative impact. In addition
7 to the document I’ve drafted, we have received,
8 as Ms. Harrell noted before the meeting, a letter
9 from — actually, two letters from an attorney
10 representing a town resident, and we’ve also
11 received correspondence from the applicant all
12 addressing the issue of segmentation and
13 cumulative impact. I have drafted this letter
14 based upon one way in which the board might look
15 at it. The board is not committed to it. It’s
16 just a draft of something to work off of. The
17 draft does — the draft of my letter does list
18 the eight criteria, which I am going to state,
19 and having stated that, then I will turn it over
20 to the board for discussion. The eight criteria
21 are:
22 Is there a common purpose or goal for each
23 segment of the plan?
24 Two, is there a common reason for each
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
14
1 segment being completed at about the same time?
2 Three, is there a common geographic location
3 involved?
4 Four, do any of the activities being
5 considered for segmentation contribute toward
6 significant cumulative or synergistic impacts?
7 Five, are the different segments under the
8 same ownership or control?
9 Six, is a given segment part of an
10 identifiable overall plan?
11 Seven, can the interrelated phases of
12 various projects not be considered functionally
13 independent?
14 Eight, does the approval of one phase or
15 segment commit the agency to continuing with
16 other phases?
17 Having read those criteria, I would now put
18 the matter up — suggest the first question the
19 board should consider now, I would suggest the
20 board should consider this question, do we want
21 to consider the two projects, Cherry Plain and
22 Satterlee Hollow, as part of the same project and
23 therefore say that we have to do a common review
24 of both projects, or do we want to say that each
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
15
1 project is functionally independent, and
2 therefore, we should proceed with the review of
3 Satterlee Hollow as its own project?
4 MR. THERAULT: Well, I think, from my
5 standpoint, the projects — and I’ve reviewed the
6 information that Mike sent out, Mike Cusack from
7 Verizon, and I fall on the side that
8 environmentally, they’re separate projects.
9 In terms of a network, they’re the same
10 project, they’re interrelated. And so it’s very
11 important for me to see and judge both projects
12 at the same time.
13 CHAIRMAN FRENCH: I disagree on that. The
14 Satterlee Hollow project can stand on its own, if
15 Cherry Plain never goes through, and it might
16 not. Satterlee Hollow will serve the Town of
17 Berlin, which would like to have cell tower
18 service. And it can be connected to Petersburg
19 and the rest of the network that way. It is not
20 necessary for — in order to have that tower that
21 we have the Cherry Plain tower. It may be
22 desirable that we have the Cherry Plain tower,
23 but I don’t see the two as the same.
24 MR. THERAULT: Well, what I heard at the
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
16
1 public hearing was that people wanted wireless
2 facilities, they wanted wireless service. And I
3 know they’re not going to be happy if that
4 service ends at the Sedgwick Inn without the
5 Cherry Plain facility being built.
6 CHAIRMAN FRENCH: Well, they’ll be less
7 happy if they don’t have any coverage up here at
8 all. If they have at least that far, they’re
9 better off than they are now.
10 MS. GILROY: I think the one issue I have
11 is, I think it’s because in the application it
12 does refer to the two as being integrated as part
13 of a larger network. However, in the response
14 Verizon has indicated they’re separate and apart,
15 and they can stand on their own, and the board
16 can determine whether Cherry Plain would be a
17 separate site or not. So this could really go
18 either way. It’s an opinion, how we view both
19 projects. But the projects are somewhat
20 interrelated, because they refer to that. In the
21 purpose section of the Berlin application, it’s
22 referring to the Cherry Plain site, a site in
23 Cherry Plain, so there is some interconnectedness
24 with Petersburg, Berlin, Cherry Plain to connect
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
17
1 to Stephentown.
2 CHAIRMAN FRENCH: It may be desirable, but
3 it isn’t required or necessary.
4 MS. GILROY: But it still refers to the
5 interconnectedness.
6 MR. NAUGHTON: Peter, can you touch on the
7 independent utility test?
8 MR. BRENNER: Okay. The question is, there
9 is another legal standard, which I have not
10 addressed so far, which I — and the point is
11 well taken that I should have. You mean the
12 public utility?
13 MR. NAUGHTON: Independent utility, in terms
14 of segmentation, and whether or not —
15 JULIE HARRELL: Can you tell us who these
16 guys are? I thought this was only town board.
17 MR. NAUGHTON: I’m Mike Naughton. I’m here
18 on behalf of Verizon, Cellco. I’m here with
19 David Brennan, my partner and we have some
20 representatives, Chris Howell and Sarah Mayberry
21 Stevens and Joe Sorrentino, he can cover any kind
22 of technical issues we have.
23 But on this legal question of segmentation,
24 you take a look at whether there’s independent
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
18
1 utility. And as we’ve indicated in our
2 application and supplementing papers, if you want
3 to take a look at a project when there’s another
4 project going on and if that project were, like
5 this one under consideration tonight, has
6 independent utility, then you can proceed with
7 that. And in this case, yes, it might be nice to
8 have coverage, but wouldn’t it be a shame if we
9 couldn’t get any cell service in Albany because
10 we haven’t built out the entire network and
11 figured it all out for the entire state and
12 country. So the case has recognized that if
13 something has independent utility, and in this
14 case it does, we’re covering an area where
15 there’s lack of coverage, the RF consultant hired
16 by the town has confirmed that, yes, indeed, this
17 will take care of it and this is the best
18 location for it, and it connects through the rest
19 of the network, through Stephentown, then you can
20 go ahead with the project when there are these
21 segmentation issues raised. And so that’s what
22 the case — that’s really the phrase the cases
23 look at when you are looking at things like this,
24 like highways, roads and cell towers.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
19
1 JULIE HARRELL: I just have a process
2 question.
3 MR. BRENNER: No, no.
4 JULIE HARRELL: May I, please.
5 MR. BRENNER: Well, I’m going to describe
6 the process, and I think that will address your
7 question because I think — first of all, this is
8 not a public hearing. It’s a public meeting in
9 the sense that it’s public —
10 JULIE HARRELL: But is he a town board
11 member?
12 MR. BRENNER: No, he is not. I’m going to
13 respond to that, and then I do not want to hear
14 additional comments from the public at this
15 point, and I will explain why. Because although
16 the meeting is, of course, a public meeting, it
17 is open to the public, we invite the public to
18 come and observe, but this is a meeting of the
19 ZBA, and the meeting is — we are not — we have
20 had a public hearing, we are not asking for or
21 allowing public comment. However, the applicant
22 has a certain right here because it’s their
23 application that’s being considered, so the
24 applicant does have the right to — well, not
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
20
1 necessarily has a right, but certainly as a
2 matter of courtesy that the board is going to
3 make a determination, to the extent to which we
4 have questions, to the extent to which the
5 applicant wants to further explain its
6 application or respond to various things, we’re
7 going to let the applicant’s representatives
8 speak with respect to their application. If we
9 were considering something beyond the application
10 tonight, if we had other items on the agenda,
11 obviously, we wouldn’t let them speak to those
12 issues. But its their application, so they do
13 have a right to address the board with respect to
14 their application.
15 JULIE HARRELL: Okay. Thank you.
16 MR. BRENNER: I think that answers —
17 JULIE HARRELL: I understand.
18 MR. BRENNER: The public utility exemption,
19 there is a general doctrine in the law, which is
20 identified in the application, I believe as a tab
21 to the application, talking about the so-called
22 public utility exemption. The public utility
23 doctrine, which basically says that a zoning
24 board of appeals or planning board or municipal
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
21
1 entity, when addressing the question of whether
2 or not to approve a public utility, must
3 exercise, I believe the case law describes —
4 it’s case law doctrine, not a statute — of a
5 relaxed standard of zoning, because cell towers,
6 like other — like electric towers, like water
7 treatment plants are important to the community,
8 they’re public utilities, and therefore, zoning
9 boards are supposed to use a relaxed standard.
10 How that relates to the segmentation issue, if
11 there’s specific cases, Mike, I don’t know of
12 them.
13 MR. NAUGHTON: No, I’m just referring to the
14 Stewart Park Coalition case, which is from 2003,
15 it’s a Second Circuit case, and it involved some
16 of the highway improvements down by Stewart
17 Airport. In that case, the court pointed out
18 that if you can show that two projects —
19 although there may be some utility and there may
20 be some connection, because, in many ways, all
21 highways are connected, it’s okay to proceed if
22 the project under consideration has independent
23 utility by itself. And in this case, Verizon has
24 indicated that what this project does is it
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
22
1 covers Route 22, at least a part of it, and it
2 covers Berlin Center where there’s a gap, and it
3 can allow Verizon to connect through Petersburg
4 through the entire network. So it really does
5 have independent utility, and Verizon will build
6 this, whether or not they ever proceed with
7 Cherry Plain. So there’s an ability here to look
8 at these two things separately, recognizing there
9 is, of course, the ability to have it all be one
10 part of a network, but you can take a look at
11 these things independently.
12 MR. THERAULT: If I may, this is from the
13 letter from Young Sommer, LLC that’s dated
14 April 13th, 2009, I believe it was sent to us by
15 Mike Cusack, and this is the — under the
16 heading, “Lack of segmentation under SEQRA”, and
17 under the planning line, “Again, although the
18 Berlin and Cherry Plain project are arguably
19 parts of the larger Verizon Wireless Network,
20 this does not negate the independent utility of
21 the Berlin site, which will provide a valuable
22 public service and connect northeastern Berlin to
23 the larger Verizon Wireless Network in the Town
24 of Petersburg to the north.” So that’s what
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
23
1 they’re speaking about when they are speaking
2 about utility. It can stand on its own.
3 MR. BRENNER: I would just note that the
4 fact that there may be a relationship between two
5 projects, there may be a relationship between
6 Cherry Plain and Satterlee Hollow does not mean
7 that they’re necessarily part of the same
8 project. The fact that they’re related, the
9 impacts of one may impact the other, we could
10 have a cumulative impact situation where — I’m
11 not saying you do, but I’m saying you could have
12 one. You could say, well, if you do this, that’s
13 going to affect what you do over here, perhaps.
14 But that doesn’t mean that they’re part of the
15 same plan. That doesn’t mean that they’re still
16 part of the same action. So if you think that
17 there’s a — that there are impacts that ought to
18 be considered, you can consider those impacts as
19 part of the cumulative impact, but that doesn’t
20 mean it’s all part of the same project for
21 segmentation purposes.
22 MR. LEWIN: I think they should be separate.
23 As Maryellen said, it’s an opinion, it could go
24 either way, and from all I’ve read from Mike
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
24
1 recently on April 13th, and our engineer, et
2 cetera, I think they should be treated
3 separately.
4 CHAIRMAN FRENCH: So do I.
5 MR. ADAMS: Yeah.
6 MR. BRENNER: What I would suggest we do
7 procedurally, here, and I didn’t spell it out at
8 the beginning. What I want to do is get the
9 sense of the board as to the various items that
10 we’re going to be discussing.
11 The first one is the segmentation. We may
12 have just — there may not be anymore discussion
13 on segmentation, but three members of the board
14 indicated — at least three members of the board
15 have explicitly said — if I’m wrong, correct
16 me — that you consider these projects should be
17 considered separate, so we do not have to
18 consider Cherry Plain as part of the same project
19 for segmentation purposes. Maryellen and Dave
20 were —
21 MR. THERAULT: No, I agree on the
22 environmental side, one hundred percent.
23 MR. BRENNER: Okay. So what I would suggest
24 we do procedurally, as we go forward with it, at
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
25
1 the end of the discussion, we’ll ask for
2 resolutions. I have, in terms of the draft of
3 the document, the three page document that I’ve
4 drafted — four pages, I’m sorry. At some point,
5 I will ask the board, after we finish our
6 discussion, if there’s any sense of any changes
7 that can or ought to be made to that document or
8 if that is the document that the board would like
9 to see attached to the environmental assessment
10 form at the end. In other words, the document
11 that we’re going to be adopting at the end of the
12 night, we will be adopting a determination of
13 significance. As part of that determination of
14 significance, there will be Part 2, which we’re
15 going to talk about in a little bit. There will
16 also be this addendum. The addendum was drafted
17 by me with the idea being that if the
18 determinations that we reached are challenged, we
19 need to explain why we reached the
20 determinations. And what I did was I drafted it,
21 and I made it very clear that this was subject to
22 the consideration of the board, this was not my
23 document, ultimately it’s the board’s document,
24 but the board should make a determination as to
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
26
1 whether or not to adopt part or all of this — of
2 my explanation with respect to segmentation or
3 cumulative impacts to explain the board’s
4 reasoning. The board can make whatever changes
5 it wants, but after we finish the cumulative
6 impact, I’ll ask for the sense of the board with
7 respect to that, and then we can make whatever
8 changes. What I have done is I have a laptop, of
9 which I have the file on it, I will make whatever
10 changes on the laptop, and then I’ll have a
11 completed document. I’ll have an accurate and
12 complete document and with any changes that need
13 to be made ready by tomorrow morning.
14 Having said that, let’s move on to the issue
15 of cumulative impacts. There are — we have not,
16 as I said before, considered the question of
17 cumulative impact, but the question has been
18 raised whether or not the Cherry Plain site will
19 have — the impacts specifically associated with
20 Cherry Plain have been visual impacts and whether
21 or not there will be visual impacts from the
22 site. And my question for the board is, do any
23 of those visual impacts have any impact on — as
24 part of our consideration of Satterlee Hollow,
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
27
1 does Satterlee Hollow effect whatever impacts
2 might occur with Cherry Plain, or in addition,
3 does Cherry Plain’s impacts in some way effect
4 Satterlee Hollow? That’s the question for the
5 board’s consideration.
6 MR. THERAULT: Well, it’s hard to know
7 because we don’t know exactly where that facility
8 is going to be, until we have a public hearing
9 and get public input, look at alternative sites.
10 And if we can nail down a site that the public is
11 happy with, then we can make a more intelligent
12 decision, I think. I’m not quite sure why we
13 haven’t proceeded with the public hearing on the
14 Cherry Plain site.
15 MR. LEWIN: Because we’re treating them as
16 separate issues.
17 MR. THERAULT: That’s fine but if we get —
18 MR. LEWIN: Let’s get Berlin done — this is
19 my opinion — let’s get Berlin done, and as Don
20 said before, without repeating a lot of verbiage
21 here, Cherry Plain is a different site, let’s get
22 Berlin done, let’s go on with that, and then take
23 off for Cherry Plain, if and when.
24 MR. THERAULT: Well —
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
28
1 CHAIRMAN FRENCH: I think the if and when is
2 the pertinent point here. The site that is
3 proposed, there are some people that have a
4 problem with it, and it may mean that another
5 site may need to be adopted —
6 MR. LEWIN: A different company, perhaps, we
7 don’t know.
8 CHAIRMAN FRENCH: — or there will be no
9 site at all and nothing be done.
10 MR. THERAULT: Well, that’s my concern,
11 Done. Because if we do end up — if Verizon or
12 some other company comes in and decides to do it
13 somewhere else, then the propagation studies will
14 change, and it’s going to have an effect on where
15 the facility in Berlin is placed.
16 CHAIRMAN FRENCH: I don’t think so. This
17 is — the best place to hook up with whatever
18 down there is Satterlee Hollow. We’ve looked at
19 all the other sites around here, and all of them
20 came up short. That gave the best. I mean —
21 MR. THERAULT: Well, best is a relative term
22 when it comes to the technology. Because if you
23 look at the propagation study performed on ALB
24 696, the Satterlee Hollow site and the ALB 697
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
29
1 Cherry Plain site, you can see we have a gap on
2 Route 22 in the center of Berlin.
3 MR. LEWIN: Well, from the very beginning,
4 David, Verizon has said that there will be some
5 gaps going up the hollows, going down the road,
6 going down the corridor, 22, et cetera, they were
7 up front with that right from the very beginning,
8 and I’ve accepted that.
9 CHAIRMAN FRENCH: There’s no one site —
10 MR. LEWIN: No matter where we put this
11 proposed tower, whether it’s here, on top of this
12 building, what, there’s going to be gaps, with
13 all the hills and hollows, whatever we’ve got
14 here. Everybody is not going to get the service.
15 There’s no doubt about it.
16 MR. NAUGHTON: I just want to also point out
17 that the town’s own RF expert that was hired
18 independently confirmed that this was the best
19 location, the Satterlee Hollow. So the town has
20 taken a hard look at that issue, so in terms of
21 this site and this application, it’s confirmed
22 that that’s the best one.
23 MR. LEWIN: David, did you get a copy of
24 that?
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
30
1 MR. THERAULT: Based on the propagation
2 studies with the two integrated?
3 MR. LEWIN: Did you get a copy of Mark’s
4 report?
5 MR. THERAULT: Oh, yes, I’ve got it right
6 here. In fact, that’s the one I’m referencing.
7 MEMBER OF THE PUBLIC: I’d like to make a
8 comment on gaps. I have a cell phone —
9 CHAIRMAN FRENCH: I don’t think we’re
10 taking — we can’t, sorry.
11 MR. LEWIN: We know there are gaps, we know
12 there will be gaps, if what all these experts say
13 is true.
14 MS. GILROY: It’s a small gap. When you
15 look at the Cherry Plain piece, it’s a small gap.
16 It’s a small area of service, really different
17 than Berlin. The Berlin study shows it will
18 cover more of an area.
19 MR. NAUGHTON: Peter, to bring it back to
20 the cumulative impact. Most of what we’re
21 looking at is on the environmental side, the most
22 likely scenario would be the visual. And the
23 report we’ve provided indicates that — probably
24 what all of you know from living here — they are
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
31
1 over five miles apart, there’s a lot of terrain,
2 mountains, vegetation, et cetera between the two
3 sites, so you are not going to have a cumulative
4 impact visually from the two, and they’ve also
5 gone up on the ridge and indicated that, at least
6 with respect to the Satterlee Hollow, there’s
7 really going to be no cumulative, negative
8 significant impacts from this.
9 MR. BRENNER: Remember that the issue that
10 you are considering is not necessarily whether or
11 not the projects are separate or for RF purposes,
12 but whether or not there will be any cumulative
13 impacts. To the extent to which there are
14 impacts that we have identified with respect to
15 Cherry Plain are basically visual impacts. If
16 there are other impacts with respect to Cherry
17 Plain, it’s hard to see how they would have any
18 impact on Satterlee Hollow. And with the visual
19 impacts, there was a study prepared by the
20 applicant, by Verizon, which was submitted to the
21 board early this week —
22 MR. LEWIN: David got that, I’m sure.
23 MR. THERAULT: Yes.
24 MR. BRENNER: — which indicates that, in
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
32
1 fact, the impacts are separate.
2 Is there a sense of the board, then, that
3 there are no cumulative impacts that need to be
4 considered, such that we can proceed with a
5 consideration of Satterlee Hollow without — that
6 which Cherry Plain will not add anything, in
7 terms of adverse cumulative impacts to the
8 consideration of the Satterlee Hollow site?
9 MR. THERAULT: I would agree.
10 MR. LEWIN: I don’t think.
11 CHAIRMAN FRENCH: Yeah.
12 MR. BRENNER: What I would also ask at this
13 point, having completed the discussion of
14 segmentation and cumulative impact, having the
15 sense of the board, I hope you’ve had a chance to
16 read the four pages that I have written. Like I
17 said, I wrote this only as a convenience for the
18 board, not to — so should those four pages be —
19 as they’re adopted, should they be what we attach
20 to the EAF as an explanation of how we’ve
21 considered segmentation or cumulative impacts, or
22 are there any changes the board would like to
23 make to that document?
24 MR. LEWIN: I have no changes.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
33
1 MR. BRENNER: Is that a sense — we’re not
2 going to do a resolution at this point unless —
3 CHAIRMAN FRENCH: Are you all right with
4 that?
5 MS. GILROY: (Nods.)
6 MR. THERAULT: Well, I haven’t had a chance
7 to read it.
8 CHAIRMAN FRENCH: Is this the first you’ve
9 seen it?
10 MR. THERAULT: First I’ve seen it.
11 MR. BRENNER: I did send a final copy this
12 afternoon, but I recognize everybody might not
13 have —
14 CHAIRMAN FRENCH: We’ve got four, let’s go
15 ahead.
16 MR. THERAULT: Go ahead.
17 MR. BRENNER: Okay. The next step is the
18 somewhat tedious process of going through the
19 actual impacts that we have, starting on Page 11.
20 And what I’m going to do is I’m going to read the
21 impact. I will not read my — I guess I will not
22 read my suggested answers, but I’ll leave it to
23 the board to see how the board wants to respond
24 on each item. There are a total of 20 numbered
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
34
1 items that we’re going to be going through, and
2 there may be some items — one, will the proposed
3 action result in a physical change to the project
4 site?
5 CHAIRMAN FRENCH: Obviously, there’s going
6 to be a tower.
7 MR. THERAULT: What page are we on now,
8 Peter?
9 MR. BRENNER: Page 11.
10 MR. THERAULT: Okay.
11 MR. LEWIN: If I don’t comment, I’m in
12 agreement; is that all right?
13 MR. BRENNER: Well, okay, maybe I’ll change
14 what I said a moment ago. I said I wasn’t going
15 to read the draft answer, maybe I should read the
16 draft answers both for the record and the board.
17 Will the proposed action result in a
18 physical change to the project site?
19 Tentative answer is, yes, it’s a small to
20 moderate impact, and it cannot be mitigated by
21 any change in the project.
22 MR. THERAULT: Agreed.
23 MS. GILROY: Agreed.
24 MR. LEWIN: Agreed.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
35
1 MR. BRENNER: Two, will there be an effect
2 to any unique or unusual land forms found on the
3 site?
4 Tentative answer, no.
5 CHAIRMAN FRENCH: Archaeological thing we
6 indicated, also.
7 MR. BRENNER: That’s not covered by that,
8 but I think it is covered later.
9 CHAIRMAN FRENCH: Later on?
10 MR. BRENNER: Yeah.
11 MR. ADAMS: This land form is — are you
12 going to excavate a rock face or…
13 MR. BRENNER: If you had like a — if we had
14 a cave that was going to be destroyed, if you had
15 a unique dune, if there was something unique in
16 the geology of the area. We’re all — two is
17 okay?
18 MR. THERAULT: Yes.
19 CHAIRMAN FRENCH: Mm-hmm.
20 MR. BRENNER: Three, will the proposed
21 action affect any water body designated as
22 protected under various articles of the
23 Environmental Conservation Law pertaining to
24 rivers and streams, wetlands and Article 25 of
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
36
1 the Environmental Conservation Law.
2 The tentative answer is, no, because the
3 proposed project is not immediately adjacent to
4 any water body.
5 MR. THERAULT: Agreed.
6 MS. GILROY: Yes.
7 MR. BRENNER: Okay.
8 Four, will the proposed action affect any
9 nonprotected system or body of water?
10 And again, tentative answer is, no.
11 CHAIRMAN FRENCH: No.
12 MR. BRENNER: Five, will proposed action
13 affect surface or ground water quality or
14 quantity?
15 Tentative answer is, no.
16 MR. LEWIN: No.
17 MR. BRENNER: Okay.
18 Six, will proposed action alter drainage
19 flow or patterns or surface water run off?
20 MR. LEWIN: No.
21 MR. BRENNER: Again, tentative answer is,
22 no.
23 Seven, will proposed action affect air
24 quality?
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
37
1 Tentative answer is, no.
2 MR. LEWIN: No.
3 MR. BRENNER: No.
4 MR. THERAULT: Agreed.
5 CHAIRMAN FRENCH: Agreed.
6 MR. BRENNER: Eight, will proposed action
7 affect any threatened or endangered species?
8 The tentative answer is, no. We have
9 received, I believe, a letter from the applicant
10 indicating that they have conducted a survey,
11 which indicates that there is no impact; is that
12 correct?
13 MR. NAUGHTON: I do have a copy of that
14 letter. I believe you have it, but if you don’t,
15 we certainly have —
16 MR. LEWIN: We’ve got it.
17 MR. BRENNER: Nine, will proposed action
18 substantially affect nonthreatened or
19 nonendangered species?
20 Again, the tentative answer is, no.
21 MR. LEWIN: Agreed.
22 MR. THERAULT: Agreed.
23 MR. BRENNER: Ten, will proposed action
24 affect agricultural land resources?
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
38
1 Tentative answer is, no.
2 MR. LEWIN: Agreed.
3 MR. THERAULT: Agreed.
4 MR. BRENNER: Eleven, will proposed action
5 affect aesthetic resources?
6 The answer to that one is, yes, and I’ve
7 identified, proposed land use, a small or
8 moderate impact for proposed land uses or project
9 proposed visible to users of aesthetic resources,
10 which will eliminate or significantly their
11 enjoyment of the aesthetic qualities of that
12 resource. But again, that’s a small or moderate
13 impact.
14 Thoughts of the board?
15 MR. THERAULT: Agreed.
16 CHAIRMAN FRENCH: Agreed.
17 MR. LEWIN: Agreed.
18 MR. BRENNER: Twelve, will proposed action
19 impact any site or structure of historic,
20 prehistoric or paleontological importance?
21 Tentative answer is, no. We also have
22 received since the — within the last week, a
23 letter from the applicant indicating that they
24 completed their archaeological investigation and
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
39
1 found nothing of any impact. But again —
2 MR. THERAULT: Agreed.
3 MR. LEWIN: It might be good for the — to
4 the audience, let them know they were independent
5 studies. Verizon didn’t do them; right?
6 MR. THERAULT: Correct. Independent
7 consultants.
8 MR. BRENNER: Yes.
9 Thirteen, will proposed action affect the
10 quantity or quality of existing or future open
11 spaces or recreational opportunities?
12 Tentative answer is, no.
13 MR. THERAULT: Agreed.
14 MR. BRENNER: Fourteen, will proposed action
15 impact any exceptional or unique characteristics
16 of a critical environmental area established
17 pursuant to the relevant SEQRA regulation?
18 The tentative answer is, no.
19 MR. THERAULT: Agreed.
20 MR. BRENNER: I don’t think there are any
21 critical environmental areas.
22 Fifteen, will there be an effect to existing
23 transportation systems.
24 Tentative answer is, no.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
40
1 MR. LEWIN: No.
2 MR. THERAULT: No.
3 MR. BRENNER: Sixteen, will the proposed
4 action affect the community source of fuel or
5 energy supply?
6 MR. LEWIN: No.
7 MR. BRENNER: Okay. And that was the
8 tentative answer, as well.
9 Seventeen, will there be objectionable
10 odors, noise or vibration as a result of the
11 proposed action?
12 Tentative answer is, no.
13 MR. THERAULT: Agreed.
14 CHAIRMAN FRENCH: Agreed.
15 MR. BRENNER: Eighteen, will proposed action
16 affect public health and safety?
17 And I have tentatively said that as yes, but
18 I would note that that’s because of the potential
19 question of radiation. However, since we’re
20 precluded from considering those issues, I’ve
21 also included that the impact cannot be mitigated
22 by any project change, which I believe is
23 sufficient. There’s nothing else we can do.
24 We’ve recognized what we can recognize, but
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
41
1 there’s nothing that can or should be done. Is
2 that the tentative answer?
3 MR. LEWIN: Agreed.
4 MR. THERAULT: Agreed.
5 MR. NAUGHTON: Peter, let me just add, we
6 did submit a report from a PE indicating that, at
7 full operation, this site is less than one
8 percent of the threshold allowed by the FCC under
9 their regulations. I just want to make sure
10 that’s clear.
11 MR. LEWIN: Very minimal.
12 MR. BRENNER: Yes. Certainly, the fact of
13 identifying it as a potential effect does not
14 mean that it is a significant effect or there
15 actually is an effect, just acknowledging the
16 potential and nothing more.
17 Nineteen, will proposed action affect the
18 character of the existing community?
19 Tentative answer, yes, because the proposed
20 action is going to enable the use of cell phones
21 in a significant portion of the town, which may
22 have an impact on the community. So that’s the
23 tentative answer. Note that it doesn’t say that
24 it will be a — the question is worded in
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
42
1 terms — it doesn’t say it’s going to be an
2 adverse, it just asks you to identify an impact.
3 In this case, we’re not characterizing it as an
4 adverse impact.
5 MS. GILROY: Peter, you listed small to
6 moderate — can you explain that — proposed
7 action will set an important precedent for future
8 projects, what does that mean? Because here we
9 go to Cherry Plain, again.
10 MR. BRENNER: You are absolutely right.
11 That’s something to be addressed. I also have
12 checked the box of the — one of the — because
13 there are a lot of subparts of this, I haven’t
14 gone through each of the subparts where there’s
15 no checkmark. In this case, one of the
16 subquestions under, will the proposed action
17 affect the existing community, was will the
18 proposed action set an important precedent for
19 future projects, and I said yes, I said there was
20 a small to moderate impact. This is the first
21 time under the telecommunications law that the
22 Town has ever considered a cell tower
23 application. Some of the things that we’ve done
24 here in this process, the way we’ve done it may,
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
43
1 arguably, be a precedent. You can look at the
2 way we’ve done it, there’s been certain things
3 all required by the local law. We’ve had a
4 balloon test, as required by law. We’ve had a
5 public hearing. We’ve hired a radio frequency
6 engineer, we had him make a report. We had him
7 make a report by coming here and giving a public
8 report at the meeting. These are ways of
9 proceeding. What we’re doing tonight with
10 respect to SEQRA is required by law, how we’ve
11 done it. None of this is necessarily binding
12 precedent, but the way I — certainly, somebody
13 might say, hey, zoning board of appeals, in 2009
14 when you considered this this last time, this was
15 how you did it, and you should do it the same way
16 as you did it back in 2009, whenever they say
17 that. That’s what I meant by saying it was an
18 important precedent. Understand, when a box is
19 checked here, what I’m doing is I’m acknowledging
20 that there might be some impact, and I’m trying
21 to be as inclusive as possible, saying anything
22 that might possibly impact us is something we
23 should, at least, recognize and acknowledge.
24 Nothing more than that, but nothing else. That’s
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
44
1 what I meant.
2 MR. NAUGHTON: Peter, if I can get back to
3 Maryellen’s question or inquiry on that one. I
4 think, to some extent, the question is posed in a
5 way whether or not the Town will be bound to do
6 the same thing the next time an application comes
7 in, and I think we agree that, for example, with
8 Cherry Plain, that that application will have to
9 stand on its own merits, and this does not in any
10 way commit the board to doing the same thing with
11 respect to the Cherry Plain application.
12 MR. BRENNER: That’s right, and that’s
13 certainly the intention of it. Certainly, what
14 you are talking about there is a substantive
15 question in terms of each project is separate and
16 has its own issues. And the only precedence that
17 might be set here, I would think, or at least my
18 intention in writing this was in terms of the
19 procedure that we followed.
20 MR. NAUGHTON: Process.
21 MR. BRENNER: And the process. And again,
22 this is subject to the board’s — the board
23 can —
24 MS. GILROY: So should the comment also
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
45
1 indicate what Mike just said, where you have the
2 project here, should there be any notation of
3 what he just said?
4 MR. NAUGHTON: I believe it’s also in the
5 record in our recent letter, too.
6 MR. BRENNER: This is the board’s document.
7 We can add that language, if you want.
8 MS. GILROY: It’s several places in the
9 document, so I’m just wondering if it should be
10 on this as well.
11 MR. BRENNER: It could be. I don’t think
12 it — there’s no reason not to, and I don’t know
13 that it’s necessary, but there’s no reason not to
14 put it in, either.
15 MR. THERAULT: I’d like to see it’s
16 included.
17 CHAIRMAN FRENCH: Could you express what you
18 are including because I missed something.
19 MS. GILROY: Sure.
20 MR. NAUGHTON: Also, I think that we’re
21 hearing an acknowledgment by the board, they’re
22 in agreement with what I just said, it’s not
23 really committing the board to act in any way
24 with respect to the Cherry Plain application.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
46
1 And I think in terms of it being covered on the
2 record, we’ve got a transcript here, and that
3 will take care of it.
4 MR. BRENNER: Well, in terms of the Cherry
5 Plain — since there will be a transcript, when
6 you come back for Cherry Plain, if, in fact, you
7 do come back, say, hey, we have this transcript
8 of the record. In terms of the SEQRA statement
9 we’re adopting or the environmental assessment
10 form, what I would suggest — I’ll try to
11 articulate some language, tell me if this is the
12 sense of it.
13 The proposed action may establish a
14 procedural precedent, but will not —
15 MR. NAUGHTON: Commit the board to any
16 action on future similar projects.
17 MR. BRENNER: — commit the board to —
18 CHAIRMAN FRENCH: I’m in agreement.
19 MR. NAUGHTON: You agree with that?
20 CHAIRMAN FRENCH: (Witness nods.)
21 MR. BRENNER: — specific substantive
22 determination with respect to any future project.
23 If anybody wonders why I’m writing this,
24 it’s because the EAF form itself is not in a
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
47
1 format that I can put onto the computer, because
2 DEC only gives you — the DEC form is only a
3 fillable PDF form, it’s not anything you can
4 edit, so I had to write it out, I had to do it —
5 MR. THERAULT: The old fashioned way.
6 MR. BRENNER: Yeah. So I’ll have my
7 secretary type that in tomorrow before the formal
8 form gets sent out.
9 Twenty, is there likely to be a public
10 controversy related to public potential adverse
11 environmental impacts?
12 I’ve answered, yes, obviously, there has
13 been.
14 MR. LEWIN: There is already.
15 MR. BRENNER: I’ll read what I’ve written as
16 the draft for the board’s consideration.
17 Although the public, as evidenced by oral
18 comments received at the public hearing and
19 letters received supports the project, the board
20 has received some comments critical of siting its
21 cell tower in the town. The controversy centers
22 on the possibility that a second tower may be
23 sited at a location which some residents oppose.
24 The board has considered and rejected the
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
48
1 argument that the second tower is part of the
2 project, and has also determined if this project,
3 even if considered in conjunction with a
4 prospective second tower, will not have
5 cumulative impacts warranting a positive
6 declaration. See supplemental statement.
7 MR. LEWIN: Mm-hmm.
8 MR. BRENNER: Is that acceptable?
9 MR. THERAULT: Agreed.
10 CHAIRMAN FRENCH: Yeah.
11 MR. ADAMS: Yeah.
12 MR. BRENNER: Okay. We have now completed
13 Part 2. We have not — of course, Part 2 of the
14 environmental assessment form.
15 Part 3 must be prepared if we have
16 identified any potential impact considered to be
17 potentially large. None of the impacts we’ve
18 identified have been potentially large;
19 therefore, we have no obligation, we’re not
20 required to complete Part 3 because there is
21 nothing additional that we need to consider.
22 Accordingly, having completed and having the
23 sense of the board with respect to Part 2, not
24 needing to complete Part 3 and having gotten the
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
49
1 sense of the board with respect to the
2 supplemental statement addressing segmentation
3 and cumulative impacts, I think we are ready to
4 make a determination with respect to the
5 significance.
6 Is there a sense that I should articulate a
7 resolution for the board’s consideration to adopt
8 a negative declaration?
9 CHAIRMAN FRENCH: Yes.
10 MR. THERAULT: Yes.
11 MR. BRENNER: Okay. Be it resolved that the
12 Town of Berlin Zoning Board of Appeals, having
13 considered its obligations under the New York
14 State Environmental Quality Review Act and having
15 considered the criteria and the full
16 environmental assessment form and having adopted
17 a supplemental statement considering the issues
18 of segmentation and cumulative impact, has
19 determined that the proposed cell tower
20 application for Satterlee Hollow will not result
21 in any large and important impacts, and
22 therefore, is one which will not have a
23 significant impact on the environment, and
24 therefore, a negative declaration should be
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
50
1 prepared and the board hereby directs and
2 authorizes its Chairman, Donald French, Junior,
3 to execute and sign the determination of
4 significance as a negative declaration for the
5 Satterlee Hollow cell tower application.
6 MR. THERAULT: I make that motion.
7 MR. LEWIN: Second.
8 MR. BRENNER: I’ll turn it over to the
9 Chairman.
10 CHAIRMAN FRENCH: Any further discussion?
11 (No affirmative response.)
12 CHAIRMAN FRENCH: All those in favor?
13 THE BOARD: Aye.
14 CHAIRMAN FRENCH: Opposed?
15 (No affirmative response.)
16 CHAIRMAN FRENCH: Ayes have it.
17 MR. BRENNER: So tomorrow, I will send to
18 Don, by e-mail, the completed environmental
19 assessment form with the change to that one —
20 the change that we made and with the requisite
21 boxes checked for the negative declaration. I
22 will send it to Don, and he can sign it and file
23 it with the town clerk, and I would suspect that
24 will be done by tomorrow morning.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
51
1 CHAIRMAN FRENCH: Or at least by tomorrow
2 night or Saturday morning.
3 MR. BRENNER: Having completed the SEQRA
4 determination, we can now move to the question of
5 the special use permit itself.
6 This is a separate document, which I have
7 also circulated and drafted.
8 MR. THERAULT: One of seven?
9 MR. LEWIN: No, one of six, you have here
10 one of seven.
11 MR. BRENNER: Yes, Page 1. Seven pages.
12 MR. LEWIN: Okay.
13 MR. BRENNER: A few words of explanation
14 about what this document is. The way the special
15 use permit is drafted, it is essentially a record
16 of everything that’s been done, and it was
17 drafted to explain the history of the
18 proceedings, the written requirements to show
19 that the applicant has complied with all of the
20 requirements of the telecommunications law, and
21 it sets forth the specific requirements that the
22 applicant is going to be — is going to be bound
23 by. The law requires that before a special use
24 permit be issued — one, it requires that we
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
52
1 complete the — actually I’m not sure by the
2 telecommunications law, but certainly, we had to
3 comply with SEQRA, under State law, and we
4 have — it also requires that a — that we
5 approve the site plan. What I’ve done in this is
6 I’ve combined the site plan approval with the
7 granting of the special use permit, this document
8 so reflects it.
9 The document starts off by — I’m going to
10 summarize the six pages of the document — the
11 first page describes the application, describes
12 what has been submitted, it describes the
13 requirements of the law, reflects the fact that
14 Verizon was required to and did submit additional
15 information with respect to the possible Cherry
16 Plain site, describes the site plan that was
17 submitted, it also describes the information that
18 they submitted to show that they were in
19 compliance with the visual impact requirements,
20 as part of that, there has been a balloon test,
21 that we had a — we received comments, that we
22 are summarizing the comments that we received,
23 both in favor of comments and referring to the
24 petition signed by 107 residents, also mentioning
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
53
1 the letter we received from Leah Kelly(phonetic)
2 and expressing her opinions with respect to the
3 issue of segmentation. It describes the — that
4 we did the report prepared by
5 Mr. Hutchins(phonetic), and that he acknowledged
6 that the search area map for Satterlee Hollow was
7 correct with regards to the visual impact, and
8 the supplemental visual impact analysis that was
9 submitted on Monday, and we’ve completed —
10 anticipating that we would, and we now have,
11 completed the environmental assessment form and
12 have directed the Chairman to sign and file it.
13 We, therefore, resolve that they should approve
14 the site plan, that the zoning board should
15 approve the site plan, authorizing the special
16 use permit to be granted, that the town will
17 authorize the permit. It sets forth the height
18 provisions, the total area of disturbance shall
19 not exceed the area described in the site plan,
20 it requires that the project be constructed in
21 accordance with the site plan. The issuance of
22 the permit is conditioned upon the applicant’s
23 agreement and compliance with all of the
24 requirements of the local law, applicant is
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
54
1 required to obtain any permits required by any
2 other local, state or federal authority, and
3 Verizon is committing to establish a tower with
4 the opportunity for colocation of other
5 telecommunications, other equipment from other
6 cell phone providers, as well as, as recommended
7 by our consultant, the possibility of
8 accommodating any wireless broadband internet
9 provider that may want to use the tower, and that
10 the — and Verizon agrees to review the
11 telecommunications tower if it becomes
12 dysfunctional, in accordance with the
13 telecommunications law.
14 Finally, there is some information that was
15 not submitted because it was not practical to
16 submit it, of which we are saying that that
17 information will be submitted prior to the
18 issuance of a building permit, material
19 pertaining to the very specific information which
20 didn’t make sense to be provided until that.
21 I understand that the applicant, Mike, you
22 have a couple other things you’d like us to —
23 MR. NAUGHTON: There’s two other
24 requirements in the cell tower law that we asked
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
55
1 for a waiver on. The first of which was the —
2 this provision, it’s a general provision that
3 would ask the applicant to name the town as an
4 additional insured with respect to the facility.
5 That would make sense in a situation where you
6 were putting this up on town property or on a
7 municipally owned facility, like a water tower.
8 It really doesn’t make any sense in this
9 situation. For example, if Stewart’s came in to
10 build a store in town, you wouldn’t make them
11 name the town as an additional insured. So we’ve
12 asked for a waiver on that part of your law.
13 We’ve also asked for another waiver. Dave,
14 can you address that?
15 MR. BRENNAN: Yes. (Pause.)
16 I’m sorry.
17 MR. NAUGHTON: There’s also a yearly FCC
18 requirement that we would provide a letter that
19 we’re in compliance. As a practical matter, we
20 don’t do that because there is no federal
21 requirements for us to do that, so it creates
22 kind of a logistical issue for us, so we’ve asked
23 that you waive off on that provision. I think
24 it’s probably for different kinds of facilities,
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
56
1 but for a cell tower like this, it doesn’t make
2 any sense.
3 MR. BRENNAN: Just to amplify that. What it
4 is is it’s asking for a yearly certification that
5 we’re in compliance with the FCC RF emissions
6 parameters. We have submitted the report from
7 the PE indicating that, at maximum output, we’re
8 less than one percent of what the FCC allows. We
9 just feel that a yearly statement to that effect
10 is something that is unrequired. On one level is
11 also pre-empted by the federal regulation by the
12 FCC of radio frequency emission, so we’re seeking
13 a waiver for that, also.
14 MR. LEWIN: May I ask a question, then, if
15 more companies co-locate on that, how does that
16 affect what you are saying, if at all?
17 MR. BRENNAN: What is typically heard, sir,
18 they go back through your town law, which
19 regulates them in quite the same way, although
20 it’s a little easier because the tower is up.
21 But they would come in with another report, and
22 they would say, okay, Verizon is up at the top of
23 this tower, if they transmit at full strength
24 because there’s that many people on the phone and
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
57
1 we hang our antennas below theirs and we turn
2 everything on, what is the cumulative impact of
3 everyone transmitting at full strength at the
4 same time, and they would compare that to the FCC
5 regulations. I can say that I’ve seen them with
6 four carriers on, where we’ve run this cumulative
7 analysis, and it’s still been below one percent
8 because we do transmit at such a low power —
9 MR. NAUGHTON: And the way your law is set
10 up, they would have to come in and apply and
11 you’d get that information and they would have to
12 prove to you that that’s okay at that point.
13 MR. BRENNAN: And certainly, I would take
14 that one step further. Your law is so stringent,
15 if we go in and start changing things, we may get
16 called back in. So if we change things and
17 change what we’re transmitting, we would end up
18 back in front of you, so we’re covered on a lot
19 of layers.
20 MR. NAUGHTON: So we ask for waivers on
21 those two points.
22 MR. BRENNER: Do you have any proposed
23 language? I was hoping you would.
24 MR. NAUGHTON: We can just maybe do that by
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
58
1 separate letter. We have addressed it now on the
2 record. If we can just get a sign-off from the
3 board and we put in a letter just confirming
4 there’s been a waiver of those two items, if
5 that’s okay.
6 MR. BRENNER: I’ll ask the board for input
7 on that. I would think that we might prefer to
8 have — this is all going to be — assuming the
9 board is going to grant the special use permit,
10 that we might want everything all in one
11 document, but it might be easier.
12 MS. MAYBERRY STEVENS: I’m sure either one
13 of these esteemed gentleman can craft that on the
14 fly, here. If not, I have to reduce their fees.
15 MR. BRENNER: I was hoping they would do the
16 work.
17 MS. MAYBERRY STEVENS: There are two of you.
18 MR. BRENNER: You probably need to site the
19 specific section of the law that you are asking a
20 waiver from.
21 MS. MAYBERRY STEVENS: My guess is Mike may
22 have referenced it in his initial application.
23 MR. NAUGHTON: It’s on Page 8 of the
24 application.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
59
1 MR. BRENNER: Just give me a second.
2 MR. NAUGHTON: So I’m just referring, for
3 your benefit, to Pages 8 and 9 of our application
4 document, and it’s entitled “I. Waiver Requests
5 for Section 29”, and number one is the radio
6 frequency emissions, and so your language would
7 be that the applicant’s request for a waiver of
8 number one, radio frequency emissions annual
9 reporting is granted.
10 MR. BRENNAN: Section 23 of the law.
11 MR. NAUGHTON: And then item two of the
12 application, on Page 9, regarding the additional
13 insured liability insurance under Section 24 of
14 your wireless telecommunications law is granted.
15 MR. BRENNAN: Specifically, it’s Section 24,
16 Subdivision b, which is the portion that says we
17 need to name the town as additional insureds.
18 MR. NAUGHTON: Are you just getting booted
19 up there?
20 MR. BRENNER: Yeah. As soon as it gets
21 booted up, I’m going to ask for it to be read
22 back. I wasn’t entirely trusting.
23 MR. NAUGHTON: It might be easier for me to
24 do it again. Want me to do it again when you are
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
60
1 ready?
2 MR. BRENNER: Yeah.
3 (A pause was taken in the proceedings.)
4 MR. NAUGHTON: Are you ready, Peter?
5 MR. BRENNER: Yeah, I’m ready. So I guess
6 we want to word this as —
7 MR. NAUGHTON: It’s part of your resolution,
8 really.
9 MR. BRENNER: I just want to make sure it’s
10 the same format.
11 The applicant is granted a waiver — no —
12 Verizon is granted a waiver —
13 MR. NAUGHTON: In accordance with —
14 MR. BRENNER: — granted in accordance
15 with —
16 MR. NAUGHTON: Do you want to just listen to
17 this for one second?
18 MR. BRENNER: Okay.
19 MR. NAUGHTON: Verizon is granted a waiver
20 in accordance with its request on Pages 8 and 9
21 of its application, dated December 17th, and
22 therefore, the applicant will not have to submit
23 annual RF certifications, and the applicant will
24 not have to name the town as a named insured or
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
61
1 additional insured on its liability policy. Does
2 that cover it?
3 MR. BRENNER: That covers it. Can you read
4 that back slowly? As you said, I just listened,
5 and I didn’t —
6 MS. MAYBERRY STEVENS: It makes you
7 appreciate the secretaries that take dictation,
8 doesn’t it?
9 (Thereupon, the following excerpt of the
10 proceedings was read back by the Court Reporter:
11 “Verizon is granted a waiver in accordance
12 with its request on Pages 8 and 9 –”)
13 MR. NAUGHTON: Do you want me to say it,
14 again?
15 MR. BRENNER: Fine. Slow, absolutely. The
16 way I started it was the applicant is granted a
17 waiver —
18 MR. NAUGHTON: In accordance with its
19 request on Pages 8 and 9 of its December 17, 2008
20 application.
21 MR. BRENNER: December 17, 2008 application.
22 MR. NAUGHTON: Period. The applicant will
23 not be required to submit annual RF certification
24 reports, and the applicant will not have to name
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
62
1 the town as a named or additional insured.
2 MR. BRENNER: Not have to name the town…
3 MR. NAUGHTON: Town as a named or additional
4 insured on its liability insurance for this
5 facility.
6 MR. BRENNER: Insured — what was that after
7 insured?
8 MR. NAUGHTON: Or additional insured for
9 this facility.
10 MR. BRENNER: For this facility, okay.
11 CHAIRMAN FRENCH: Do you want to read that
12 back?
13 MR. BRENNER: First, I’ll correct all the
14 typos, and then I’ll read it back. So I’ll read
15 it once to myself. (Pause.)
16 Let me read that back. The applicant is
17 granted a waiver in accordance with its request
18 on Pages 8 and 9 of its December 17th, 2008
19 application. The applicant will not be required
20 to submit annual RF certification reports and the
21 applicant will not have to name the town as a
22 named or additional insured for this facility.
23 MS. GILROY: Section 23 and 24.
24 MR. BRENNER: Absolutely. Is granted a
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
63
1 waiver from the requirements of — wait a minute,
2 I’ll add the section.
3 MR. NAUGHTON: The first one is 23.
4 MR. BRENNER: 23.
5 MS. GILROY: I think he said 24(b).
6 MR. NAUGHTON: 24, Subsection b, yes.
7 MS. GILROY: 24(b).
8 MR. BRENNER: 24(b) of the communications
9 law. Granted waivers, because there’s two
10 separate waivers. (Pause.)
11 Okay. I think we’ve got it. The applicant
12 is granted waivers from the requirements of
13 Section 20-23 and 24(b) of the telecommunications
14 law in accordance with its requests on Pages 8
15 and 9 of its December 17th, 2008 application.
16 The applicant will not be required to submit
17 annual RF certification reports and the applicant
18 will not have to name the town as a named or
19 additional insured for this facility.
20 MR. NAUGHTON: That covers it.
21 MR. BRENNER: Yeah. The part of me that’s
22 the journalist sort of doesn’t like “name the
23 town as a named”, but I suppose this is legal
24 writing, so it doesn’t have to be —
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
64
1 CHAIRMAN FRENCH: Doesn’t have to make
2 sense.
3 MR. BRENNER: Right. Now, that’s simply
4 just adding that to the language, we haven’t
5 adopted anything. The board has not considered
6 this. But I have summarized, before we went off
7 on that, going into those waivers, I did
8 summarize what the special use permit is. Any
9 reaction, thoughts, comments? The board should
10 discuss it, think about it.
11 MR. LEWIN: Why not get an annual report?
12 JULIE HARRELL: Thank you.
13 MR. BRENNER: I’m going to leave that to the
14 applicant to respond to.
15 MR. LEWIN: Whether you do it or not in
16 other towns, I don’t know, and I don’t really
17 care. But it is minimal from what I’ve read and
18 what you’ve said, but what’s the big deal about
19 not —
20 MS. MAYBERRY STEVENS: As Mike said, it’s
21 more of an issue of practicality than anything
22 else.
23 MR. LEWIN: Well, if it’s practical, then do
24 it.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
65
1 MS. MAYBERRY STEVENS: Well, no, actually,
2 the problem is it’s impractical from our
3 perspective.
4 MR. LEWIN: Why? I need help here.
5 MS. MAYBERRY STEVENS: Ultimately, we don’t
6 have a specific group or department or — there
7 is no personnel who would be tracking this,
8 there’s no mechanism in place —
9 MR. LEWIN: To measure?
10 MS. MAYBERRY STEVENS: — that says on an
11 annual basis for a particular facility in a
12 particular town this report needs to be created.
13 It’s different from, let’s say, the automated
14 rent roll for paying a landlord where all of the
15 thousands of sites that Verizon Wireless has
16 across the country, everything gets put in and
17 checks are automatically distributed or insurance
18 policies, if something has to be sent out, it’s
19 automatically done. There’s simply no mechanism
20 for it within the company. What it would fall to
21 would be me or somebody like me who is handling
22 another project to, for instance, have a tickler
23 in some system somewhere that reminds me, oh,
24 it’s time for that annual report. I may not be
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
66
1 here tomorrow, I may not be here two years from
2 now. And if I’m not here and I’m not the one
3 remembering somehow my Microsoft Outlook tasks is
4 setting that up, there’s no mechanism for having
5 somebody do that.
6 MR. NAUGHTON: If I can just add another
7 layer to it —
8 MR. LEWIN: It still doesn’t make sense.
9 MR. NAUGHTON: This is a very unusual
10 provision in your law. So if all the towns had
11 these provisions in their law, then obviously,
12 Verizon would have a mechanism, have it all set
13 up where they would comply. I don’t know why
14 this is in there. But for a telecommunications
15 provider like Verizon, it doesn’t really make any
16 sense because the RF isn’t going to change. So
17 if all towns had these requirements, we would be
18 doing this and sending them in, and it would be a
19 matter of course. But it’s a very strange thing.
20 And Verizon wants to — if it says it’s going to
21 do something in accordance with this permit, it
22 wants to comply. And what we’re hearing is, it’s
23 going to be difficult to ensure that we do
24 comply. We don’t want to be out of compliance by
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
67
1 not sending in that letter.
2 MR. LEWIN: I’m sure you don’t. What would
3 change it, then — I don’t want to prolong
4 this — if you put up different panels or
5 something, the RF?
6 MR. NAUGHTON: If someone were to come in
7 and put up different panels, then as we
8 indicated, we would have to come back in and
9 amend the application, and then you would be
10 getting that information in connection with that.
11 So nothing is going to change up there because it
12 can’t under your application.
13 MR. LEWIN: Until you change panels?
14 MR. NAUGHTON: Right. And we would have to
15 come in and ask for that first.
16 MR. LEWIN: Okay. Thank you.
17 MR. NAUGHTON: The equipment that we are
18 applying for is going to be up there until we
19 have to come in and request an amendment of our
20 application. That’s according to your own law;
21 right, Dave?
22 MR. BRENNAN: Yes. And then at that time,
23 we routinely will have a professional engineer go
24 through and say, okay, with these changes, where
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
68
1 are we with respect to compliance with the FCC?
2 And at that time, I can almost be assured that
3 it’s still going to say we’re well below one
4 percent because I’ve seen so many of those
5 reports now, I’m comfortable with that at the low
6 powers we use, and we’ll update the board at that
7 point.
8 MR. NAUGHTON: It’s a good question, though.
9 MS. MAYBERRY STEVENS: As an added
10 assurance, as much as we want to be in compliance
11 with the local regulations, what is of utmost
12 importance to us is to be in compliance with our
13 license requirements. And if we were to not be
14 in compliance with the FCC regulations, we risk
15 very heavy fines and we —
16 MR. LEWIN: You won’t be here next year.
17 MS. MAYBERRY STEVENS: We risk much more
18 than a problem with you here. We would risk a
19 problem nationally, and that’s just simply
20 something that we’re not going to put ourselves
21 in that risk category.
22 MR. LEWIN: Satisfied. Thank you.
23 MS. GILROY: So you don’t do this for any
24 other municipality?
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
69
1 MS. MAYBERRY STEVENS: No. I have yet to
2 have to do that.
3 MS. GILROY: You haven’t seen that.
4 MR. BRENNER: The board, obviously, doesn’t
5 have to accept the waivers and we can change any
6 or all of the special use permit as drafted or
7 even adding that additional paragraph with the
8 waivers, but it’s up to the board.
9 MR. LEWIN: I’m happy with what you have
10 there.
11 CHAIRMAN FRENCH: Somebody want to make a
12 motion that we accept this as amended?
13 MR. ADAMS: I make a motion.
14 CHAIRMAN FRENCH: Second?
15 MR. LEWIN: Second.
16 CHAIRMAN FRENCH: Further discussion?
17 MR. BRENNER: So the motion, I guess, should
18 be in the form of does the — be it resolved that
19 the Town of Berlin Zoning Board of Appeals hereby
20 authorizes and directs the — hereby approves
21 this special use permit and site plan approval
22 for the application of Cellco Partnership, doing
23 business as Verizon Wireless, to construct a
24 telecommunications facility at the Satterlee
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
70
1 Hollow site, and hereby authorizes and directs
2 its Chairman, Donald French, Junior, to so
3 certify and sign the permit and file it with the
4 town clerk. That will be the resolution.
5 Somebody needs to make that motion.
6 MR. ADAMS: Okay. I’ll make the motion.
7 CHAIRMAN FRENCH: Second?
8 MR. LEWIN: Second.
9 CHAIRMAN FRENCH: Any further discussions?
10 MR. THERAULT: Well, I would have much
11 preferred to considered the two projects as a
12 tandem. In the spirit of cooperation, I’ll go
13 with you on this.
14 CHAIRMAN FRENCH: Okay.
15 MR. THERAULT: I think it’s a giant step
16 forward for the town. I think there could have
17 been greater opportunities had we looked at it a
18 little closer, in terms of the Toadson(phonetic)
19 Road property. I don’t think that was handled
20 quite the way that it should be. I think the
21 town is setting itself up for, perhaps, some
22 legal challenges on that site, because it was
23 such a good reasonable alternative to the
24 proposed site. But I understand the opposition
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
71
1 for that site.
2 MR. LEWIN: When you said possible lawsuit,
3 you are referring to the reservoir site?
4 MR. THERAULT: Well, just in terms of, if
5 this process is reviewed by a higher authority or
6 in some legal forum, there’s been no formal
7 acknowledgment by the town board to prohibit
8 siting a facility there.
9 MR. LEWIN: Okay, okay.
10 MR. THERAULT: There’s been informal
11 discussion and comments.
12 CHAIRMAN FRENCH: But there are comments
13 from the landowner who has given the town the
14 right of way to that site, and that landowner
15 says it will not give permission to Verizon or
16 anybody else to use that right of way to go in
17 and use that site. That’s the first item.
18 The second item is, Mark Hutchins indicated
19 that because of the ridge to the south of that
20 site, the site would not give the coverage that
21 the Satterlee Hollow site does.
22 MR. THERAULT: I understand that. And Mark
23 Hutchins identified, in an ideal area where the
24 facility could be constructed and deliver about
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
72
1 the same level of service throughout the town,
2 and that site happens to be on the edge of that
3 ideal area. And I believe that if the Cherry
4 Plain facility were to move to a different site,
5 that ideal area would be shifted, somewhat in
6 favor of that site. But that’s my objections.
7 I think the Satterlee Hollow is a good site.
8 I think it’s — in terms of the aesthetics, I
9 think it’s achieved quite a bit in its setting,
10 it’s not, what they call, daylit, exposed on a
11 hill top. And I only wish that we could have
12 achieved more comprehensive wireless
13 communications for the Town of Berlin on the
14 north end with one facility.
15 I believe that the Verizon company is trying
16 to achieve too much with too little in,
17 essentially, ten miles of very tough terrain,
18 they just proposed two facilities, and I’m
19 concerned about the coverage gaps. I’m concerned
20 about certain roads in town with no coverage,
21 Green Hollow being one, very low coverage on
22 Southeast Hollow.
23 And so with those reservations, I would join
24 the board in approving the project.
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
73
1 CHAIRMAN FRENCH: Thank you.
2 MR. LEWIN: So in other words, you think
3 there should be more towers, David, to cover
4 these other things?
5 MR. THERAULT: Yes.
6 MR. LEWIN: Okay.
7 CHAIRMAN FRENCH: In Verizon’s defense, the
8 town board indicated to them early on it didn’t
9 want more than two towers. As it is, we’re going
10 to end up with three, which is the one we didn’t
11 know about, which is up on Gutermuth Road, which
12 is not that far from you.
13 MS. GILROY: Just in response to that,
14 David, we’re concerned about visual impacts and
15 two, at least, minimizes it. You don’t want to
16 have towers all over. So I think we should try
17 to do the best we can to cover a public need.
18 And if there’s some gap in coverage, well, you
19 have gaps. But frankly, as a resident here, I
20 don’t want to see cell phone towers all over.
21 MR. LEWIN: I’d rather not see the two we’re
22 going to have, but we have to get into the 21st
23 century.
24 MS. GILROY: Correct. But the law says we
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
74
1 cannot prevent those from going up, so we have to
2 abide by the law. But again, it’s a trade-off,
3 and those things are always trade-offs, so we
4 should really be limiting them.
5 CHAIRMAN FRENCH: Is there more discussion?
6 (No affirmative response.)
7 CHAIRMAN FRENCH: All those in favor?
8 THE BOARD: Aye.
9 CHAIRMAN FRENCH: Opposed.
10 (No affirmative response.)
11 CHAIRMAN FRENCH: That’s it.
12 MS. GILROY: Peter, just in response, on the
13 County Planning Board, you need to sign within
14 30 days the decision, the copy of our action to
15 them, just as a reminder.
16 MR. BRENNER: Right.
17 MS. GILROY: And as we go forward, we had
18 asked the County Planning Board to review the
19 zoning board action for Cherry Plain, has that
20 been received, Don?
21 CHAIRMAN FRENCH: From?
22 MS. GILROY: From the County Planning, from
23 Linda to you?
24 CHAIRMAN FRENCH: I received nothing. We
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
75
1 sent it in to them, but I got nothing back.
2 MS. GILROY: Okay, okay.
3 CHAIRMAN FRENCH: At least nothing that I’m
4 aware of. Having said that, sometimes the mail
5 is slow.
6 MS. GILROY: Okay. Because we sent that out
7 in January, and I think we should know before we
8 go forward with Cherry Plain.
9 CHAIRMAN FRENCH: If my memory serves me
10 correctly, if they don’t respond within 30 days,
11 they aren’t objecting.
12 MS. GILROY: No, they would put that in
13 writing. So I can follow-up with Linda.
14 CHAIRMAN FRENCH: Please do so, so we’ve
15 covered ourselves.
16 MS. GILROY: How do we go forward with
17 Cherry Plain? Is that a discussion here?
18 MR. BRENNER: I’ll ask that question.
19 MR. NAUGHTON: We have some technical issues
20 still we want to work out. So we need a little
21 more time on that to review those technical
22 issues.
23 MR. BRENNER: You have done the balloon
24 test?
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
76
1 MR. NAUGHTON: Yes.
2 MR. BRENNER: So the next step in our
3 process would be to convene a public hearing.
4 MR. NAUGHTON: Right.
5 MR. BRENNER: Which if you have some other
6 issues, you might want to submit some revised
7 material to us —
8 MR. NAUGHTON: We might have to submit some
9 kind of supplement just on some of the technical
10 issues. So we need a little more time on that,
11 so we’re not pushing that forward.
12 MR. BRENNER: Okay. Could you send us a
13 letter to the effect that we should hold it in
14 abeyance until such time —
15 MR. NAUGHTON: Yes.
16 CHAIRMAN FRENCH: Cherry Plain?
17 MR. BRENNER: On Cherry Plain.
18 MS. MAYBERRY STEVENS: I just mentioned that
19 very same thing to Dave.
20 MR. BRENNER: We don’t want to be accused of
21 not proceeding on it.
22 MS. MAYBERRY STEVENS: Because you have some
23 obligations on timing.
24 CHAIRMAN FRENCH: Did you run another
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
77
1 balloon test up in that area?
2 MR. NAUGHTON: We had a balloon up because
3 the supplemental report we put in indicating
4 areas along the trail. We had floated a balloon,
5 yes.
6 CHAIRMAN FRENCH: That clarifies that
7 because I’ve been asked.
8 MR. NAUGHTON: That was us.
9 MR. LEWIN: That was just about a week ago;
10 right?
11 MR. NAUGHTON: Is there anything else on the
12 agenda?
13 MR. BRENNER: The only thing we still have
14 to do, I guess, the board probably wants to
15 consider this, in a technical sense, we never
16 approved the minutes from last month’s meeting,
17 which we probably should.
18 MR. THERAULT: I make a motion we accept the
19 minutes as printed.
20 MR. LEWIN: Second.
21 CHAIRMAN FRENCH: All in favor?
22 THE BOARD: Aye.
23 CHAIRMAN FRENCH: Opposed?
24 (No affirmative response.)
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
78
1 CHAIRMAN FRENCH: The ayes have it.
2 (Whereupon, the proceedings in the
3 above-entitled matter concluded at 9:06 p.m.)
4 *****
5
6
7 C E R T I F I C A T I O N
8
9 I, SADIE L. HERBERT, Shorthand Reporter and
10 Notary Public in and for the State of New York,
11 do hereby CERTIFY that the foregoing record taken
12 by me at the time and place noted in the heading
13 hereof is a true and accurate transcript of same,
14 to the best of my ability and belief.
15
16 ________________________________
17 SADIE L. HERBERT
18
19 Dated: May 8, 2009
20
21
22
23
24
AMF REPORTING/CRITCHER VIDEO
(518) 452-1795 1-877 NYS DEPO
This document was created with Win2PDF available at http://www.win2pdf.com.
The unregistered version of Win2PDF is for evaluation or non-commercial use only.
This page will not be added after purchasing Win2PDF.