• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Current Newspaper PDF
  • Eastwick Press Info
  • Contact Us

The Eastwick Press Newspaper

Eastern Rensselaer County's Community Newspaper

  • Community Calendar
  • School News
  • Sports Outdoors
  • Obituaries
  • Letters & Comments
  • Church Directory

Oak-Mitsui Site Clean Up Announced by DEC

May 5, 2022 By eastwickpress

Oak-Mitsui Technologies LLC (Oak), the owner of the property, will be executing the environmental cleanup work at the 80 First Street Site in the Village of Hoosick Falls. The environmental cleanup action will be performed as an Interim Remedial Measure (IRM) under NY’s State Superfund Program and the provisions of an Order on Consent established between Oak and the NYS Department of Environmental Conservation (NYSDEC). An IRM is a cleanup activity that may be implemented when the source of contamination or exposure pathway can be effectively addressed in the near term. The objective of this IRM is to prevent contact with residual levels of contamination in the soil.

Highlights and Key Components of the IRM:

• Installation of a 2-ft thick cover system that consists of a 6-inch gravel underdrain placed directly over existing asphalt or concrete foundations and 18 inches of soil cover over the gravel underdrain.

• Installation of a new storm sewer to convey storm water from the end of First Street out to the Hoosic River.

• Creation of a sloped area covering a retaining wall and former coal chutes on the east side of the site.

• Replacement of site fencing in specific locations that are currently damaged. Repaving the former employee parking lot on the south side of First Street.

• Abandonment of specific groundwater monitoring wells and retrofitting other wells for future use.

• A mixture of evergreen and deciduous trees will be planted, for aesthetic reasons only, along the southeast border of the project site to serve as a transition between the site and the adjacent neighborhood.

• The implementation of the IRM will allow for restricted-residential, commercial or industrial use, including use for active recreational activities.

According to DEC, the work on the site may begin as early as this month.

Filed Under: Hoosick Falls

Primary Sidebar

Archives

Footer

Local News

February 3, 2023 Edition

View this week’s entire newspaper by tapping or clicking on the image:

38th Annual Ice Fishing Contest Rescheduled

Submitted by GLSP Due to warmer than usual temperatures, the 38th annual ice fishing contest at Grafton Lakes State Park has been rescheduled for Saturday, Feb. 11, from 5:30 am to 2 pm. Join in on the fun as several-hundred anglers brave the cold temperatures for their chance to make a winning catch on several […]

Celebrating Retiring Board President Deborah Tudor

On Tuesday, January 25, Cheney Library honored Ms. Deborah Tudor for her 12 years of service on the Cheney Library Board of Trustees. During her tenure as a trustee, Ms. Tudor made immense contributions to physical improvements of the library’s property. Some of these projects include the installation of a propane fireplace, creation of the […]

School News

February 3, 2023 Edition

View this week’s entire newspaper by tapping or clicking on the image:

Powers Claims Runner-Up

At Inaugural NYSPHSAA Girls Wrestling Invitational Submitted by BNL Varsity Wrestling Coach Wade Prather Tallulah Powers was runner-up at 165 pounds in the inaugural NYSPHSAA Girls Wrestling Invitational held at Onondaga Community College. She was one of only three finalists from Section 2, and the only Runner Up. The meeting of 204 of the State’s top female […]

November 25, 2022 Edition

View this week’s entire newspaper by tapping or clicking on the image:

Copyright © Eastwick Press · All Rights Reserved · Site by Brainspiral Technologies